Open Interior with 3/4” Thermal Breaks R-5.5* Heat Flow Down R-3.4* Heat Flow Up Open Interior without Thermal Breaks and a Nominal 3/4” Drape R-4.0* Heat Flow Down R-3.2* Heat…
Search Results
Search results for “Jetblue Airlines Business Class Flight 800-299-7264 Ticket Booking Reservation”
Metal Building – Roof – New
Metal Building – Roof – Retrofit
Open Interior with 1”x 2” Furring R-7.5* Heat Flow Down R-3.6* Heat Flow Up Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the…
Metal Building – Wall – New
Open Interior with a 3/4” Thermal Break: R-4.6 Open Interior with a Nominal 3/4” Drape in Product (No Thermal Break): R-3.7 Note: Installation instructions and illustrated drawings are recommendations only,…
Metal Building – Wall – Retrofit
Open Interior: R-3.5 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Insulation products are a technologically advanced…
Metal Building – Roof – New
Open Interior with 3/4” Thermal Breaks R-10* Heat Flow Down (and a Radiant Barrier) R-4.5* Heat Flow Up Open Interior without Thermal Breaks and a Nominal 3/4” Drape R-7.6* Heat…
Metal Building – Roof – Retrofit
Open Interior with 1”x 2” Furring R-11* Heat Flow Down (and a Radiant Barrier) R-4.4* Heat Flow Up Please Note: In addition to the stated R-value, this application also provides…
Metal Building – Wall – New
Metal Interior with a 3/4” Thermal Break: R-8.2 Open Interior with a 3/4” Thermal Break: R-6.0 Metal Interior with a Nominal 3/4” Drape in Product (No Thermal Break): R-5.9 Open…
Metal Building – Wall – Retrofit
Open Interior: R-4.5 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Insulation products are a group of…
Post Frame Building – Roof – New
Below the Purlins Metal Interior R-11 Heat Flow Down (and a Radiant Barrier) | R-5.1 Heat Flow Up Open Interior R-9.0* Heat Flow Down (and a Radiant Barrier) | R-4.4*…
Post Frame Building – Roof – Retrofit – Bottom of Purlin
Bottom of the Purlins Metal Interior R-11 Heat Flow Down (and a Radiant Barrier) | R-5.1 Heat Flow Up Open Interior R-9.0* Heat Flow Down (and a Radiant Barrier) |…
Post Frame Building – Roof – Retrofit – Bottom of Truss
Bottom of the Trusses Open Interior R-10* Heat Flow Down (and a Radiant Barrier) | R-3.7* Heat Flow Up Please Note: In addition to the stated R-value, this application also…
A New Application for Reflectix – WAY TO GO, ALEX!
Thought I’d try and bring a smile to your face. My son used one of your rolls for a class project. He was studying the Middle Ages and used the…