…also by eliminating air flow into the back side of the batt (which reduces stated R-values). The third benefit addresses Radiant Heat Flow that the wall would ordinarily absorb (a…
Search Results
Search results for “Air Antilles Airlines Airlines Reservation 800-299-7264 Official Site Phone Number”
Knee Wall
Duct Insulation R-6.0
R-6.0 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Utilizing Reflectix® to enhance the efficiency of your existing…
Duct Insulation R-4.2
R-4.2 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Utilizing Reflectix® to enhance the efficiency of your existing…
Attic
…upgrading your attic system. When installed properly, a reduction of up to 10% in the home’s air conditioning usage can result. The products are clean, lightweight and easy to install….
Sill Sealer
Air and Moisture Barrier Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Made from ribbed polyethylene foam, Reflectix®…
Attic
…excellent, energy-efficient choice for upgrading an attic system. When installed properly, a reduction of up to 10% in the home’s air conditioning usage can result. The products are clean, lightweight…
Duct Insulation R-4.2
R-4.2 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…
Duct Insulation R-5.6
…choice when selecting insulation for round or rectangular ductwork in HVAC systems. The product provides an R-5.6 when installed with a 0.375” air gap between the duct and the insulation….
Big Bubble Duct Insulation R‑6.0
R-6.0 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…
Duct Insulation Outdoor R‑5.6
…the first choice when selecting insulation for outdoor round or rectangular ductwork. The product provides an R-5.6 when installed with a 0.375” air gap between the duct and the insulation….
Duct Insulation Outdoor R‑8.0
…when selecting insulation for outdoor round or rectangular ductwork. The product provides an R-8.0 when installed with two 0.75” air gaps between the duct and two layers of the insulation….
Metal Building – Roof – Retrofit
…of 1.32 UP and 4.55 DOWN for interior air film. Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer….
Metal Building – Wall – New
Metal Interior with a 3/4” Thermal Break: R-8.2 Open Interior with a 3/4” Thermal Break: R-6.0 Metal Interior with a Nominal 3/4” Drape in Product (No Thermal Break): R-5.9 Open…
Post Frame Building – Roof – New
…energy that ordinarily would be transmitted to the interior of the building is blocked. * Includes thermal resistance of 1.32 UP and 4.55 DOWN for interior air film. Note: Installation…
Post Frame Building – Roof – Retrofit – Bottom of Purlin
…ordinarily would be transmitted to the interior of the building is blocked. * Includes thermal resistance of 1.32 UP and 4.55 DOWN for interior air film. Note: Installation instructions and…
Post Frame Building – Roof – Retrofit – Bottom of Truss
…resistance of 1.32 UP and 4.55 DOWN for interior air film. Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the…
Post Frame Building – Roof – New
Below the Purlins Open Interior R-6.4* Heat Flow Down | R-3.7* Heat Flow Up Above the Purlins Open Interior R-3.8* Heat Flow Down | R-3.5* Heat Flow Up Note: Installation…
Post Frame Building – Roof – Retrofit – Bottom of Purlin
Bottom of the Purlins Open Interior R-6.4* Heat Flow Down | R-3.7* Heat Flow Up Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are…
Post Frame Building – Roof – Retrofit – Bottom of Truss
Bottom of the Trusses Open Interior R-6.6* Heat Flow Down | R-3.0* Heat Flow Up Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are…
HVAC/R Literature and Submittals
…Submittal Revised 102022 F58 – Rad Fl Wood Joists Submittal Revised 102022 F44 – Reflectix RAP Return Air Panning Bubble Submittal Revised 102022 N38 – Reflectix RAP Return Air Panning…
Attic
…upgrading your attic system. When installed properly, a reduction of up to 10% in the home’s air conditioning usage can result. The products are clean, lightweight and easy to install….
Work Shop
Roof – Radiant Barrier Wall – Masonry R-3.7 and R-7.0 Wall – 2” x 4” R-6.6 (No Fiberglass) Wall – 2” x 4” R-14 Total Assembly (R-3.9 and a Vapor/Moisture…
Water Heater
R-4.5 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. This application is a great option for the Do-It-Yourselfer…
Products
…Spacers Expansion Joint Pipe Wrap Insulation Radiant Barrier (Reflective/Woven Fabric/Reflective) Return Air Duct Panning (Bubble) Return Air Duct Panning (Corrugate) Sill Sealer Single Reflective Insulation Tapes: Foil and White Poly…
Wall – Exterior (2 x 6)
R-21 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the…
Wall – Exterior (2 x 4)
R-14 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the…
Storage Building
Roof – Radiant Barrier Wall – Masonry R-3.7 and R-7.0 Wall – 2” x 4” R-6.6 (No Fiberglass) Wall – 2” x 4” R-14 Total Assembly (R-3.9 and a Vapor/Moisture…
Crawl Space R-21
R-21 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix is now offering a dramatically improved performance application…
Basement Ceiling
R-16 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. When considering options for a basement ceiling, Reflectix® Reflective/Bubble…
Metal Building – Roof – New
Open Interior with 3/4” Thermal Breaks R-5.5* Heat Flow Down R-3.4* Heat Flow Up Open Interior without Thermal Breaks and a Nominal 3/4” Drape R-4.0* Heat Flow Down R-3.2* Heat…
Metal Building – Roof – Retrofit
Open Interior with 1”x 2” Furring R-7.5* Heat Flow Down R-3.6* Heat Flow Up Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the…
Duct Insulation (Big Bubble)
…gives Reflectix® high reliability and strength. The product has a tape running the length of the roll for easy identification by code officials. The tape identifies the manufacturer and ASTM…
Wall – Exterior (2 x 6)
R-21 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the…
Wall – Exterior (2 x 4)
R-14 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the…
Post Frame Building – Wall – New
Inside the Girts Open Interior: R-4.2 Outside the Girts Open Interior: R-3.7 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of…