Search Results

Search results for “where the best place to get cheap airline tickets phone number 1-800-299-7264”

Privacy Policy

…may also be revealed: your name, e-mail address, home and work addresses, telephone and fax numbers and any plain text commentary. Additionally, the complete record of your actions at the

Small Project Roll Applications

“My kids joke that my hobbies are recycling and insulating, but it’s no joke!” — Ellen B., Albuquerque, NM —   Reflectix® Reflective/Bubble product excels in a wide variety of…

Hobby Roll Applications

“My kids joke that my hobbies are recycling and insulating, but it’s no joke!” — Ellen B., Albuquerque, NM —   Reflectix® Reflective/Bubble product excels in a wide variety of…

Frequently Asked Questions

…benefit. What is an R-value? An R-value is an assigned number derived from a specific testing procedure (or calculation) to determine a material’s (or building assemblage) “resistance to conductive heat…

Performance Information

…conjunction with an air space, it provides a quantifiable R-value level of benefit. What is an R-value? An R-value is an assigned number derived from a specific testing procedure (or…

Duct Insulation R-6.0

R-6.0 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…

Big Bubble Duct Insulation R-8.0

R-8.0 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…

Duct Insulation Outdoor R‑6.0

R-6.0 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…

Contact Information

Location: #1 School Street, Markleville, IN 46056 Mailing Address: Reflectix, Inc., P.O. Box 108, Markleville, IN 46056 Social Media: vimeo.com/user175013284 www.youtube.com/ReflectixInsulation www.facebook.com/ReflectixInsulation www.linkedin.com/company/reflectix-inc Email: customerservice@reflectixinc.com Phone: (765) 533-4332 or (800)…

Duct Insulation Spacers

…Duct Insulation. The spacers are easy to work with, and provide an enclosed air space between the duct and the insulation. The enclosed air space (and number of enclosed air…

What About R-values?

What is an R-value? An R-value is an assigned number derived from a specific testing procedure (or calculation) to determine a materials (or building assemblage) “resistance to conductive heat transfer”….

Duct Insulation R-5.6

R-5.6 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…

Duct Insulation Outdoor R‑5.6

R-5.6 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…

Wall – Exterior (2 x 6)

R-21 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the

Wall – Exterior (2 x 4)

R-14 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the

Work Shop

Roof – Radiant Barrier Wall – Masonry R-3.7 and R-7.0 Wall – 2” x 4” R-6.6 (No Fiberglass) Wall – 2” x 4” R-14 Total Assembly (R-3.9 and a Vapor/Moisture…

Wall – Exterior (2 x 6)

R-21 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the

Wall – Exterior (2 x 4)

R-14 Total Assembly (R-3.9 and a Vapor/Moisture Barrier for the Reflectix®) Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the

Storage Building

Roof – Radiant Barrier Wall – Masonry R-3.7 and R-7.0 Wall – 2” x 4” R-6.6 (No Fiberglass) Wall – 2” x 4” R-14 Total Assembly (R-3.9 and a Vapor/Moisture…

Duct Insulation Outdoor R‑8.0

R-8.0 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® Duct Insulation is an alternative to other types…

Reflectix® RAP (Corrugated Sheet) Return Air Duct Panning

Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix® RAP (Corrugated) is an alternative to conventional sheet metal…

Expansion Joint

…expansion joint is the solution for your concrete placement needs. It is flexible and can be utilized for curved or straight applications. Reflectix® Expansion Joint is sealant-friendly working well with…

Expansion Joint

…expansion joint is the solution for your concrete placement needs. It is flexible and can be utilized for curved or straight applications. Reflectix® Expansion Joint is sealant-friendly working well with…

Reflectix History 101

The old baseball field across the street from the original school is now gone, and a 30,000 square foot building stands in its place. The company has expanded from just…

2018 I-RIM Conference Costa Rica a Great Success!

…Techniques of Measuring Water Vapor Transmission – Michael Joyce The Power of the Marketplace – Steve Baden and Laurel Elam, RESNET Reflectives and the International Code Council (ICC) – Wes…

Pallet Cover

…pharmaceuticals. The one-piece durable cover is quick and easy to place over the pallet. The TempShield Pallet Cover maintains temperature ranges reducing damage caused by temperature fluctuation when loading or…

Monty Millspaugh Receives Prestigious ASTM Award

The challenge for product recognition in the market place was significant. The efforts by Monty and others in those initial years of establishing ASTM documents, were a crucial element in…

Trade Shows & Events

…IL / www.ahrexpo.com Int’l Builder’s Show: February 27 – 29 / Las Vegas, NV / Booth # C7243 Do it Best Spring Market: February 11 – 13 / Indianapolis, IN…

The Reflectix 2022 Trade Show Schedule

…2 / Las Vegas, NV / www.ahrexpo.com Int’l Builder’s Show: February 8 – 10 / Orlando, FL / Booth W4207 / www.buildersshow.com Do it Best Spring Market: February 11 –…

Kevin Thompson Retires After 33 Years of Faithful Service to Reflectix

Dear All, With much appreciation for nearly 33 years of service, Reflectix and the whole Balcan Innovations team wishes best regards to Kevin Thompson as he retires this month. His…

Post Frame Building – Wall – New

Inside the Girts Metal Interior: R-6.3 Open Interior: R-5.3 Outside the Girts Metal Interior: R-5.5 Open Interior: R-4.7 Note: Installation instructions and illustrated drawings are recommendations only, while proper local…

Post Frame Building – Wall – Retrofit

Inside the Girts Metal Interior: R-6.3 Open Interior: R-5.3 Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. Reflectix®…

Post Frame Building – Roof – New

Below the Purlins Open Interior R-6.4* Heat Flow Down | R-3.7* Heat Flow Up Above the Purlins Open Interior R-3.8* Heat Flow Down | R-3.5* Heat Flow Up Note: Installation…

Wall – Masonry

R-3.7, R-7.0 and a Vapor/Moisture Barrier Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are the responsibility of the installer. The Do-It-Yourselfer has several…

Post Frame Building – Roof – Retrofit – Bottom of Purlin

Bottom of the Purlins Open Interior R-6.4* Heat Flow Down | R-3.7* Heat Flow Up Note: Installation instructions and illustrated drawings are recommendations only, while proper local construction methods are…